This pipeline was welded and fitted on site. The stainless steel pipe and fittings came from our own stock, and our technical team carried out the work at the customer's location - measuring the runs, welding the branch connections, and fitting the line in position. We supplied the material and completed the installation. If you need pipeline welding or fitting done at your site, contact us.